对于深基坑工程而言,在实际施工过程当中出现的很多问题都是因为不合理的施工方法所导致的,因此在施工之前应做好充分的准备工作。如果选择不正确的方法进行施工时,不仅导致工民建工程质量不符合规范要求,还会对工程的安全性与稳定性造成一定的损害。在深基坑工程当中需要注意很多的问题,任何一个环节对于整个施工过程都是比较重要的。因此,要及时地掌握施工的相关技术知识,科学设计施工方案,结合工程实际,控制支护施工质量,发挥支护施工在工民建工程中的更高效益。
For deep foundation pit project, many problems appearing in the actual construction process are caused by unreasonable construction methods, so adequate preparations should be made before the construction. If you choose the incorrect method for construction, it will not only lead to the quality of the construction project does not meet the specification requirements, but also cause certain damage to the safety and stability of the project. There are many problems that need to be paid attention to in the deep foundation pit project, and any one link is more important for the whole construction process. Therefore, it is necessary to grasp the relevant technical knowledge of construction in time, scientifically design the construction plan, control the quality of support construction according to the actual project, and bring into play the more efficient benefits of support construction in the industrial and civil engineering.